9.15.17MillDamBridgeLegalNotice

Town of Marbletown

Legal Notice

 

Please take notice that the Town Board of the Town of Marbletown is accepting bids from qualified contractors for the replacement of the Mill Dam Road Bridge over Stone Ridge Pond Outlet. The work includes removal and disposal of the existing bridge superstructure, partial substructure removal, constructing the new precast concrete box culvert, performing road reconstruction, and installing box beam railings. Approach highway work, grading, and minor clearing are also included. The project is paid for by municipal funding, hence prevailing wage rates apply. The bid package will be available on Thursday, September 21, 2017 at 1:00 PM and can be purchased for a non-refundable amount of $50.00 at the Town Clerk’s Office located at 1925 Lucas Ave.  Bids shall be accepted until 1:00 PM on Monday, October 2, 2017 at which time they will be opened and read aloud by the Town Engineer and Highway Superintendent. The Town Board will consider the bids and the matter of awarding the contract on October 3, 2017 at 7:00 PM.  The project shall be completed no later than November 30, 2017.

 

By order of the Town Board of the Town of Marbletown

Heather Moody, Town Clerk

Dated: Sept. 15, 2017